Skip to content

Nine Retrobuoy™ systems installed to protect forties field platforms

  • 9
    RetroBuoy 450 Amps
  • 9
    Rectifier skids
  • 9
    Topside junction boxes

Related Integrated Services

Flexible Riser Integrity Monitoring Wirebreak fatigue from Pulse
Case study pack download

Subsea asset integrity management case study pack

Solutions for the operating and late-life project phases

Discover four examples of our subsea asset integrity assurance solutions that provide independent, engineered-for-purpose and data-driven solutions for critical supporting subsea infrastructure. Download this e-book for Acteon solutions that serve the operating and late-life project phases.

Download

Related Information