Case Studies

SURF installation project completed ahead of schedule during monsoon season
Construction

SURF installation project completed ahead of schedule during monsoon season

InterMoor demonstrated their subsea, umbilicals, risers and flowlines (SURF) capabilities and delivered the installation of a new electric submersible pump (ESP) system...
A world-first for floating drill operations using motion compensation in deep water
Construction

A world-first for floating drill operations using motion compensation in deep water

Imodco Terminals were contracted to install a catenary anchor leg mooring (CALM) buoy to facilitate the reliable transfer of products from very large crude carriers to...
A well severance solution for three subsea tieback wells and eight dual-bore wells
Decommissioning

A well severance solution for three subsea tieback wells and eight dual-bore wells

As part of their Gulf of Thailand Asset Retirement Programme, Chevron was looking for a well severance solution for three subsea tieback wells and eight dual-bore wells...
Grouting of Monopiles Transition Pieces: 116 Piles, United Kingdom
Construction

Grouting of Monopiles Transition Pieces: 116 Piles, United Kingdom

The grout was installed in order to provide impact and corrosion protection to the foundations. Core used a high-capacity continuous jet mixing unit to ensure...
Innovative mooring connector - Minestro Wave Energy Project, Holyhead Deep
Construction

Innovative mooring connector - Minestro Wave Energy Project, Holyhead Deep

SRP supplied a full set of design drawings, specifications and procedures, to allow Probe to manufacture, assemble and test the full system. To guarantee that our...
Grouting of offshore substation - German sector North Sea
Construction

Grouting of offshore substation - German sector North Sea

A high-strength material was used for this project which Core brought through the ZiE approval process to provide grouting services for the installation of an offshore...
Providing design assistance for wave converter moorings in Australia
Construction

Providing design assistance for wave converter moorings in Australia

The Perth Project was the first demonstration of a complete grid-connected CETO system anywhere in the world, the only wave project to consist of three units operating...
Supporting delivery of a £15m project to replace pipes under the Solent
Construction

Supporting delivery of a £15m project to replace pipes under the Solent

Aquatic’s operations team joined Visser & Smit Hanab’s people on board the barge to ensure the operation went smoothly, enabling the pipes to be laid successfully...
Wikinger project Baltic Sea (Germany)
Construction

Wikinger project Baltic Sea (Germany)

LDD’s PPT is being used to pre-install foundation piles into the seabed, prior to the placement and grouting of the four-legged jacket foundation structures by means...