

Onshore rigless conductor and pile installation service allows operators to drive and install conductor pipe offline before the drill rig arrives on location.
This service offering is similar to the conventional conductor driving services but includes the driving and installation of the conductor pipe offline before the drill rig arrives on location. It uses a specialist onshore rigless land frame to support the conductor pipe in its vertical position during the driving process.
On a typical project, additional lengths of pipe are welded to continue driving deeper, according to the clients’ set target depth. The pipe is then cut, leaving the client with an installed conductor pipe before the drill rig is on location. This can save critical time for the operator and achieve substantial cost savings, which makes this an effective and efficient way to install conductor pipe for onshore oil and gas wells.
Delivered by Claxton
Claxton combines a fast-track design and project engineering service with a large rapid call-off inventory to deliver integrated end-to-end life of field solutions for customers' renewable and oil and gas energy projects all around the world.


Integrate this product
Acteon can also offer an integrated project management service. This involves managing the activities of one or more of our companies on a customer’s behalf and providing a single point of contact for all aspects of project management.


DRILLING AND DECOMMISSIONING SERVICES - REQUEST MORE INFORMATION
Acteon’s expertise in drilling and decommissioning spans decades and covers the full lifecycle of a project from the acquisition of subsea information and data, to bespoke drilling packages to onshore disposal and recycling.