Skip to content

Suspended well abandonment

Facility
Subsea
Industry
Oil & Gas
Product or Service
Service
Suspended Well Abandonment from InterMoor

InterMoor specialises in full planning and execution of suspended well decommissioning campaigns. They handle all aspects of the project providing a single source solution for open water well abandonment.

A complete turnkey solution for suspended well decommissioning campaigns.

This service includes vessel charter, project management, engineering, and onshore and offshore operations from the initial review of well schematics and assistance with regulatory permit applications to the production of final end of well reports. This approach enables our clients to adopt a minimal input hands off approach, thereby allowing them to focus on their core operations.

InterMoor is not a vessel owner which means they can focus 100% of their efforts on the needs of the client and not vessel utilisation.

This approach is based on combining a cost-effective vessel-based platform with specialist bespoke rigless abandonment equipment to deliver a fit for purpose solution. InterMoor’s specialist team works with Acteon company, Claxton, utilising SWAT to deliver a cost-effective solution to suspended well P&A.

Delivered by InterMoor

InterMoor designs, supplies and deploys technically advanced mooring systems and provides rig-move and back-of-the-boat installation services worldwide.

White jigsaw puzzle

Integrate this product

Acteon solutions can simplify the interface between Acteon and customers that need more than one of its operating companies’ products or services to address their subsea challenges, whatever their scale and complexity. Each combination is packaged as a customer-specific integrated service and delivered through a single Acteon point of contact under a single contract.

Decommissioning Services
E-book download

Decommissioning Buyers Guide

Fresh thinking and technical innovation to reduce field abandonment costs

All offshore oil and gas installations must eventually be decommissioned. Increasingly, the pressure is on the operators or licensees of redundant fields and suspended wells to act sooner rather than later. Download this e-book for fresh thinking and technical innovation to reduce field abandonment costs.

Download

Similar products and services