Skip to content

Case Studies

InterMoor overcomes operational challenges to install pre-lay mooring near Indonesian shoreline
Moorings and anchors

InterMoor overcomes operational challenges to install pre-lay mooring near Indonesian shoreline

Using their experience in mobile and permanent mooring installation, InterMoor had to consider several challenges during the planning and operations stages, including...
Bruce Anchor GP chosen as first ever anchor on R6 chain project
Moorings and anchors

Bruce Anchor GP chosen as first ever anchor on R6 chain project

The Bruce Anchor GP was tested then chosen as the first ever anchor on an R6 mooring chain rig.
Successful FPSO mooring installation under tight schedule
Foundations and cables Moorings and anchors

Successful FPSO mooring installation under tight schedule

Several Acteon branded services came together to deliver a seamless integrated FPSO mooring installation, making use of robust internal systems, competency frameworks...
Installation of two deepwater FPSO mooring systems in a single integrated campaign
Foundations and cables Moorings and anchors

Installation of two deepwater FPSO mooring systems in a single integrated campaign

InterMoor, an Acteon company, was contracted for the provision of engineering and offshore services for the installation of 16 mooring lines to a semisubmersible...
Bespoke solutions for a wave energy converter installation
Moorings and anchors

Bespoke solutions for a wave energy converter installation

The project showcases our ability to develop fit-for-purpose mooring and installation solutions for a new product whilst leveraging our extensive offshore experience to...
Precision landing: InterMoor positions Noble Sam Hartley alongside Golden Eagle
Geo-services Moorings and anchors

Precision landing: InterMoor positions Noble Sam Hartley alongside Golden Eagle

InterMoor have concluded the rig move of Noble Sam Hartley from Cromarty Firth to Golden Eagle on behalf of CNOOC Ltd. The work comprised of a dimensional control survey...
A world-first for floating drill operations using motion compensation in deep water
Foundations and cables Geo-services Moorings and anchors

A world-first for floating drill operations using motion compensation in deep water

Imodco Terminals were contracted to install a catenary anchor leg mooring (CALM) buoy to facilitate the reliable transfer of products from very large crude carriers to...
Innovative mooring connector - Minestro Wave Energy Project, Holyhead Deep
Moorings and anchors

Innovative mooring connector - Minestro Wave Energy Project, Holyhead Deep

SRP supplied a full set of design drawings, specifications and procedures, to allow Probe to manufacture, assemble and test the full system. To guarantee that our...
Providing design assistance for wave converter moorings in Australia
Moorings and anchors

Providing design assistance for wave converter moorings in Australia

The Perth Project was the first demonstration of a complete grid-connected CETO system anywhere in the world, the only wave project to consist of three units operating...