Integrated marine foundation installation services

Informed by decades of experience, we deliver efficient, reliable marine foundation installation services that reduce offshore risk, lower project costs and ensure schedule certainty. By combining Menck, Acteon’s Marine Foundations business line’s piling and drilling expertise, with advanced tooling and smart integration, we help offshore developers move from plan to execution – safely, rapidly and with greater confidence. 

150+

Years combined experience and world record deepwater installations (WD 2,120m)

We act in the most challenging conditions

Our foundation installation services support major offshore energy projects around the world, providing safe, efficient and future-ready delivery from seabed to surface.

Challenges and benefits icon.

Maximising efficiency for offshore operations

We optimise deck layouts, integrate equipment and deploy multi-skilled crews to reduce personnel on board (POB), vessel time and double handling. Our joined-up approach means faster mobilisation, leaner campaigns and greater value from every offshore day.

Challenges and benefits icon.

Delivering reliability in complex environments

Our tooling and techniques are proven in extreme conditions, from difficult seabeds to ultradeep water. With proprietary systems like our deep-water hammer and drive–drill–drive method, we deliver robust, reliable foundations that keep projects moving safely and on schedule.

Challenges and benefits icon.

Driving down costs through smarter, data-driven installation

We reduce total installed cost through smarter technology, digital integration, and intelligent design. Through early engagement and leveraging local logistics know-how, we develop solutions that reduce operational complexity and cost, without compromising on performance or integrity.

Drilled pile installation services

Precision drilling for complex offshore conditions

We deliver specialist drilled pile installation services for projects where driven methods alone aren't viable. We’ve one of the largest fleets of reverse circulation, pile-top and rocket socket drilling rigs in the world, which can deliver in any soil or rock type. Our drill rigs can be tooled to suit a large range of pile sizes varying from 0.6 m with ongoing developments beyond 12 m in diameter and are equipped to drill both vertical and inclined piles up to 18 degrees.

Our drilling systems are designed for tight tolerances, enabling stable foundations where precision is paramount.

Our technology

Our integrated drilling systems improve control, reduce risk and maximise efficiency in demanding offshore conditions. Our products include: grout bags for pipeline span free rectification, pile upending systems and pinned lifting tools.

Page

Drive-Drill-Drive (3D)

A combined drill and hammer method that allows us to adapt to complex ground conditions, increasing reliability and reducing unplanned downtime.

Page

Rocksteady® quick connect lifting tool

A quick connector for heavy lifting operations that enables safer, faster offshore lifting with reduced manual handling and faster cycle times.

Page

Grouting services

Our high-output, automated grouting systems ensure consistent grout delivery for monopiles, jackets and sleeves- even in challenging conditions.

Latest case studies

Case Studies

05 Feb 2026

Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm

Menck, Acteon’s Marine Foundations business line, delivered its largest offshore grouting operation to date for DEME, supporting the installation of 61 turbine foundations at the Yeu-Noirmoutier Offshore Wind Farm. To keep pace with DEME’s rapid installation schedule, we executed large annulus grouting operations at previously unmatched pumping rates, achieving exceptionally fast turnaround times between pours and enabling fast consecutive foundation installations.

Case Studies

29 Jan 2026

Integrated offshore jacket installation and foundation solution in the Republic of Congo

Menck, Acteon’s Marine Foundations business line, delivered a fully integrated jacket installation solution for the Congo LNG project in 27 m water depth. The project required precise execution in a challenging marine environment. Tight tolerances, complex logistics, and remote coordination added pressure to deliver a safe, first-time-right installation.

Case Studies

20 Mar 2025

Efficient and safe lifting for gas field development offshore Australia

Acteon was contracted by HMH Wirth to supply two Rocksteady® RSL 500 heavy offshore lift tools for a gas field development project off the coast of Western Australia.

Driven pile installation services

Reliable, high-performance driven pile solutions

We deliver fast, effective driven pile installations for offshore foundations, jackets and mooring systems. Our fleet includes a wide range of hydraulic hammers, from 100 to 6250 kJ, and advanced lifting tools, like Rocksteady, enabling time and cost savings. Designed for precision and rapid deployment, our systems reduce vessel time, environmental impact and installation risk, even in challenging or ultradeep offshore environments. Available with flexible delivery models, our technology and expertise support efficient, cost-effective execution across a wide range of offshore energy projects.

Our technology

We combine advanced tooling with proven offshore methods to maximise driven pile success and minimise environmental impact.

Drive-Drill-Drive (3D)

A combined drill and hammer method that allows us to adapt to complex ground conditions, increasing reliability and reducing unplanned downtime.

Hydraulic double acting impact hammers

Acteon’s Hydraulic double acting impact hammers support offshore driven pile installation in challenging conditions. Higher energy transfer, better drivability and integrated foundation design support.

Noise mitigation systems

Acteon’s MNRU system delivers effective pile driving noise mitigation for offshore wind and oil and gas projects. Reduce underwater noise at the source and meet environmental regulations.

Grouting services

Our high-output, automated grouting systems ensure consistent grout delivery for monopiles, jackets and sleeves- even in challenging conditions.

Latest case studies

Case Studies

05 Feb 2026

Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm

Menck, Acteon’s Marine Foundations business line, delivered its largest offshore grouting operation to date for DEME, supporting the installation of 61 turbine foundations at the Yeu-Noirmoutier Offshore Wind Farm. To keep pace with DEME’s rapid installation schedule, we executed large annulus grouting operations at previously unmatched pumping rates, achieving exceptionally fast turnaround times between pours and enabling fast consecutive foundation installations.

Case Studies

25 Jan 2025

Dual FPSO installation of driven and suction pile mooring systems offshore China

Intermoor delivered a complex mooring campaign for two FPSOs offshore China, installing 25 mooring lines and suction piles under tight weather windows and Covid-19 restrictions.

Case Studies

05 Apr 2023

Integrated solution for installation of over 300 piles on major wind farm

Discover how Acteon deployed an integrated solution to monitor and install 349 piles, 111 WTG jackets, and 2 OSS jackets at a major Southeast Asia wind farm.

Latest resources

Explore our foundation solutions in action - from offshore wind installations to complex drilling projects in deep water.

Case Studies

05 Feb 2026

Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm

Menck, Acteon’s Marine Foundations business line, delivered its largest offshore grouting operation to date for DEME, supporting the installation of 61 turbine foundations at the Yeu-Noirmoutier Offshore Wind Farm. To keep pace with DEME’s rapid installation schedule, we executed large annulus grouting operations at previously unmatched pumping rates, achieving exceptionally fast turnaround times between pours and enabling fast consecutive foundation installations.

Case Studies

29 Jan 2026

Integrated offshore jacket installation and foundation solution in the Republic of Congo

Menck, Acteon’s Marine Foundations business line, delivered a fully integrated jacket installation solution for the Congo LNG project in 27 m water depth. The project required precise execution in a challenging marine environment. Tight tolerances, complex logistics, and remote coordination added pressure to deliver a safe, first-time-right installation.

Blogs

05 Nov 2025

Offshore construction for FPSOs – delivering margin, speed and certainty

Offshore construction is the work that brings an offshore energy project to life. It’s a chain of interdependent phases: positioning, construction support, and foundation or mooring system installation. Each stage brings its own challenges. While design work may be finalised early, offshore success depends on how well those plans adapt to real-world conditions.

Speak to our experts

We’re here to help. Speak to our team about how our integrated foundation installation services can reduce risk, save time and support safer, smarter delivery offshore.

Fabian Hippe

Strategic & Commercial Director

David Down