

Pre-lay moorings involve the provision and installation of a complete additional mooring spread before the floating asset arrives on location.
In effect for a pre-lay campaign two mooring systems are provided, with the rig using one whilst the second is ‘leap-frogged’ to the next well and prepared. The rig can therefore move to the new location and hook up to the installed mooring without waiting.
Benefits of pre-laying the mooring system:
- Financial
- Safety and integrity
- Scheduling
- Provides additional local activities.
It is clear that the direct financial benefits of pre-lay are a key factor, but the enhanced safety and integrity are critical aspects for consideration. Pre-laying a mooring spread moves this activity off the rig’s critical path and reduces the substantive time (and cost) pressures that holding up a drilling programme entails.
Acteon’s latest mooring connector, the IM Release allows faster “leap-frogging” between systems thanks to a Teledyne enabled acoustic release system, that can disconnect at the push of a button.
Delivered by InterMoor
InterMoor is a world-leader in mooring technology, specialising in mooring assets from engineering and project management to provision of equipment to installation, inspection and repair.


Integrate this product
Acteon can also offer an integrated project management service. This involves managing the activities of one or more of our companies on a customer’s behalf and providing a single point of contact for all aspects of project management.


MOORINGS AND ANCHORS SOLUTIONS - REQUEST MORE INFORMATION
Acteon’s solid domain knowledge in mooring design and offshore mooring operations spans the globe. We have installed some of the largest offshore assets in all water depths. We provide an integrated service covering the entire project lifecycle, from engineering, mooring design, procurement, and installation, through to maintenance and decommissioning.