Insights and News
Showing 46 results with applied filters.
Case Studies
12 Feb 2025
Swift and seamless geotechnical solutions for Germany’s offshore windfarm
UTEC completed a swift geotechnical site investigation in Germany’s North Sea. From vessel mobilisation to onboard CPT and lab testing, the project concluded successfully ahead of schedule.
Case Studies
28 Jan 2025
Complex FPSO top chain replacement completed safely and efficiently
Intermoor supported a major North Sea FPSO with mooring maintenance, replacing top chains and winch wire coordinating SIMOPS across four vessels - minimising risk, downtime, and environmental impact.
Case Studies
25 Jan 2025
Dual FPSO installation of driven and suction pile mooring systems offshore China
Intermoor delivered a complex mooring campaign for two FPSOs offshore China, installing 25 mooring lines and suction piles under tight weather windows and Covid-19 restrictions.
Case Studies
01 Aug 2024
Monopile collar installation at Kaskasi Offshore wind farm
Menck delivered precision grouting and custom equipment for the first-ever monopile collar stabilisation trial at Germany’s Kaskasi wind farm.
Case Studies
16 Jul 2024
PROD reaches CPT depth where others failed in challenging soils at Polish site
Portable Remotely Operated Drill (PROD) performed deep cone penetration tests at 22 offshore sites in Poland’s Baltic Sea, overcoming complex soil conditions to support wind turbine foundation design.
Case Studies
09 May 2024
Laser scanning and topographic survey of La Rosiere Desalination Plant
UTEC completed a 3D laser and underwater LiDAR survey of Jersey Water’s La Rosière Desalination Plant, capturing high-resolution data to support safe, efficient site development.
Case Studies
09 Apr 2024
Real-time riser integrity monitoring in loop current environment
UTEC delivered real-time riser integrity monitoring for a 5,197 ft deep platform in the Gulf of Mexico, enabling safe, uninterrupted drilling in high-current conditions.
Case Studies
13 Mar 2024
Integrated solution for the water level measurement inside monopiles
Acteon provided a Water Level Measurement (WLM) system to detect the water level fluctuation inside the WTG monopile foundation below the airtight platform.
Case Studies
13 Feb 2024
Uninterrupted production during mooring line top wire replacement
Intermoor delivered a full-scope top wire replacement for a 57-year-old offshore platform in Brazil, completing the operation safely in just 45 hours, without disrupting production.
Case Studies
17 Oct 2023
Platform life optimisation: Advanced strain monitoring system
UTEC delivered a Fiber Bragg Grating (FBG) strain monitoring system for a semi-submersible platform in 2,000 m water depth, enabling real-time structural analysis.
Case Studies
10 Oct 2023
Turnkey survey solution for challenging Black Sea development
UTEC, was contracted by Subsea7 to provide survey services for the Sakarya gas field development offshore Türkiye in the Black Sea.
Case Studies
03 Jun 2023
Fjord moorings for Hywind Tampen floating wind turbines
Acteon provided several pre-lay mooring systems. All four wind turbines were connected to the prelay mooring spreads in September 2022 and were secured to the moorings until the units were towed to Tampen Field and installed offshore with the other seven units.