Insights and News

Showing 53 results with applied filters.
Clear all filters |

Case Studies

01 Jul 2025

Innovative chain replacement method supports Bonga’s life extension project

Intermoor replaced the top chain on all twelve mooring lines (four groups of three) of the Bonga FPSO, located 120 km southwest of the Niger Delta.

Case Studies

24 Jun 2025

Decommissioning of two single point mooring (SPM) Calm Buoys

Intermoor was commissioned by a global energy operator in Southeast Asia to decommission two Single Point Mooring (SPM) Calm Buoy Systems and the associated subsea infrastructure.

Case Studies

14 May 2025

Fast and reliable mooring line repair on an FPSO

Intermoor carried out a successful emergency mooring intervention on a 10-year-old Floating Production Storage and Offloading (FPSO) offshore Brazil.

Case Studies

20 Mar 2025

Seamless integration: Acteon's North Sea grouting operation success

Menck, Acteon’s Marine Foundations business line delivered offshore grouting services to install a wellhead platform foundation and four-legged jacket with driven foundation piles in the North Sea.

Case Studies

20 Mar 2025

Efficient and safe lifting for gas field development offshore Australia

Acteon was contracted by HMH Wirth to supply two Rocksteady® RSL 500 heavy offshore lift tools for a gas field development project off the coast of Western Australia.

Case Studies

12 Feb 2025

Swift and seamless geotechnical solutions for Germany’s offshore windfarm

UTEC completed a swift geotechnical site investigation in Germany’s North Sea. From vessel mobilisation to onboard CPT and lab testing, the project concluded successfully ahead of schedule.

Case Studies

28 Jan 2025

Complex FPSO top chain replacement completed safely and efficiently

Intermoor supported a major North Sea FPSO with mooring maintenance, replacing top chains and winch wire coordinating SIMOPS across four vessels - minimising risk, downtime, and environmental impact.

Case Studies

25 Jan 2025

Dual FPSO installation of driven and suction pile mooring systems offshore China

Intermoor delivered a complex mooring campaign for two FPSOs offshore China, installing 25 mooring lines and suction piles under tight weather windows and Covid-19 restrictions.

Case Studies

01 Aug 2024

Monopile collar installation at Kaskasi Offshore wind farm

Menck delivered precision grouting and custom equipment for the first-ever monopile collar stabilisation trial at Germany’s Kaskasi wind farm.

Case Studies

16 Jul 2024

PROD reaches CPT depth where others failed in challenging soils at Polish site

Portable Remotely Operated Drill (PROD) performed deep cone penetration tests at 22 offshore sites in Poland’s Baltic Sea, overcoming complex soil conditions to support wind turbine foundation design.

Case Studies

Laser scanning and topographic survey of  La Rosiere Desalination Plant

UTEC completed a 3D laser and underwater LiDAR survey of Jersey Water’s La Rosière Desalination Plant, capturing high-resolution data to support safe, efficient site development.

Case Studies

09 Apr 2024

Real-time riser integrity monitoring in loop current environment

UTEC delivered real-time riser integrity monitoring for a 5,197 ft deep platform in the Gulf of Mexico, enabling safe, uninterrupted drilling in high-current conditions.