Insights and News
Showing 49 results with applied filters.
Case Studies
03 Jul 2026
Integrated site characterisation supports floating offshore wind development in the North Sea
UTEC, Acteon’s Geo-services business line, delivered integrated geophysical, environmental and geotechnical surveys across Bellrock and Broadshore floating offshore wind sites in the North Sea, supporting early-stage site characterisation and development planning.
Case Studies
17 Jun 2026
Deepwater decommissioning campaign for Petrojarl I FPSO
Intermoor, Acteon’s Moorings and Anchors business line, executed a multi-phase offshore decommissioning campaign for Petrojarl I FPSO offshore Brazil. The first phase included the provision of engineering for pull-in wire replacement, risers pull-out, mooring line disconnection, including a contingency plan of non-operability of mooring winches and the FPSO towing preparation and tow plan.
Case Studies
30 Apr 2026
Rock-socket piling supports ferry terminal upgrade in challenging Scottish ground conditions
Menck, Acteon’s Marine Foundations business line, delivered nearshore drilling and grouted rock-socket piling works to support marine infrastructure upgrades at Kennacraig Ferry Terminal in Scotland.
Case Studies
02 Apr 2026
Integrated marine foundations solution delivered for offshore mooring pile installation in Congo
Acteon’s Menck and 2H delivered a full offshore drilling and grouting service for eight mooring piles, supporting the Scarabeo 5 marine foundations project in Congo.
Case Studies
05 Feb 2026
Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm
Menck, Acteon’s Marine Foundations business line, delivered its largest offshore grouting operation to date for DEME, supporting the installation of 61 turbine foundations at the Yeu-Noirmoutier Offshore Wind Farm. To keep pace with DEME’s rapid installation schedule, we executed large annulus grouting operations at previously unmatched pumping rates, achieving exceptionally fast turnaround times between pours and enabling fast consecutive foundation installations.
Case Studies
29 Jan 2026
Integrated offshore jacket installation and foundation solution in the Republic of Congo
Menck, Acteon’s Marine Foundations business line, delivered a fully integrated jacket installation solution for the Congo LNG project in 27 m water depth. The project required precise execution in a challenging marine environment. Tight tolerances, complex logistics, and remote coordination added pressure to deliver a safe, first-time-right installation.
Case Studies
10 Dec 2025
Deepwater geotechnical site investigation offshore Mozambique using PROD technology
UTEC, Acteon’s Geo-services business line, delivered a comprehensive deepwater geotechnical investigation offshore Mozambique using the Portable Remotely Operated Drill (PROD5) seabed drilling system, combining sampling and in situ data to characterise challenging seabed conditions.
Case Studies
12 Sep 2025
Floating Storage and Offloading (FSO) disconnection, removal and towing
Intermoor, Acteon’s Moorings and Anchors business line, completed the disconnection, removal, and towing of a 20-year old FSO vessel in the Gulf of Thailand.
Case Studies
13 Aug 2025
High-accuracy rail infrastructure surveys
UTEC completed laser and topographic surveys at 15 Scottish rail sites for Mott MacDonald, capturing high-resolution data under live rail conditions.
Case Studies
17 Jul 2025
Seamless pipeline tie-in decommissioning and asset transfer
Intermoor delivered 46 complex pipeline tie-in disconnections, asset recoveries, and wet storage operations across multiple offshore fields for a major Southeast Asia energy operator.
Case Studies
01 Jul 2025
Innovative chain replacement method supports Bonga’s life extension project
Intermoor replaced the top chain on all twelve mooring lines (four groups of three) of the Bonga FPSO, located 120 km southwest of the Niger Delta.
Case Studies
24 Jun 2025
Decommissioning of two single point mooring (SPM) Calm Buoys
Intermoor was commissioned by a global energy operator in Southeast Asia to decommission two Single Point Mooring (SPM) Calm Buoy Systems and the associated subsea infrastructure.