Insights and News
Showing 204 results.
Case Studies
06 May 2020
World-first offshore anchor pile installation using drill rig with motion compensation platform in the Caribbean Sea
Acteon delivered a world-first offshore anchor pile installation in the Caribbean Sea using a reverse circulation drill rig with motion compensation.
Blogs
20 Jan 2020
How do suction piles work
Suction piles can be deployed as deep mooring anchors and foundations for subsea infrastructure. We review how suction piles work, how they are installed and embedded in the seafloor.
Case Studies
02 Jan 2020
FPSO mooring system using SEPLAs
Intermoor delivered a custom SEPLA-based mooring system for a turret-moored FPSO off West Africa, replacing temporary moorings with a permanent, deepwater solution using nine 28-te anchors.
Case Studies
15 Jul 2019
Virtual decommissioning with iSite: Dunlin Alpha Project
Acteon’s iSite platform enabled virtual oversight of Dunlin Alpha decommissioning, reducing risk with laser scans, paperless reporting, and smart task tracking.
Case Studies
12 Jul 2019
Real time mooring line monitoring on Espírito Santo FPSO
The challenge: reliable mooring line monitoring in deep water. The Espírito Santo Floating Production Storage and Offloading (FPSO) was supplied by SBM for the Parque das Conchas (BC-10) field, offshore Brazil. The FPSO which is moored in about 1,780 m of water is operated by Shell in its joint venture with Petrobras and ONGC. The vessel consists of a subsea turret anchored with nine mooring lines.
Case Studies
11 Jul 2019
From mooring to decommissioning with a deepwater FPU
Intermoor provided end-to-end mooring services for an FPU in the Gulf of Mexico, from installation to safe decommissioning over an eight-year period.
Case Studies
03 Jul 2019
Monitoring of driven pile installation for 70 wind turbine bases
UTEC, designed, tested, installed and operated the positioning and monitoring systems for pre-piling templates and 40 m-long and 2.5 m-diameter foundation driven piles at 70 locations.
Case Studies
03 Jul 2019
Successful custom CALM buoy disconnection offshore West Africa
Intermoor safely disconnected and laid down two ageing risers from a calm buoy in 384 m water depth using bespoke tooling and subsea clamps.
Case Studies
03 Jul 2019
Anadarko’s Red Hawk Spar decommissioning
InterMoor, Acteon’s Moorings and Anchors business line, partnered with Anadarko to decommission the Red Hawk Spar, situated at a depth of 1,585 m.
Case Studies
12 Feb 2019
Stones Turritella FPSO pre-commissioning
The Turritella FPSO, which arrived in January 2016, is turret-moored via a dis-connectable Buoyant Turret Mooring (BTM) system with nine mooring lines arranged in three bundles. Each line includes an in-line mooring connector (ILMC) located ~900 ft subsea, pre-tensioned prior to FPSO arrival. Upon recovery of the BTM, Intermoor performed final chain tensioning via the ILMCs, removed excess chain, and managed riser pull-in rope transfer to the FPSO.
Blogs
01 Dec 2016
Wire rope in offshore moorings: Uses, construction, and fatigue
Wire rope is a versatile, high‑performance component across offshore mooring systems and broader marine operations. This article covers wire rope applications in offshore moorings and marine operations, wire rope fabrication and configurations and performance, corrosion protection and inspection.
News
01 Dec 2014
Intermoor completes Delta House hook up
Intermoor, Acteon’s Moorings and Anchors business line, has successfully installed and hooked up a permanent mooring system for the Delta House field floating production system (FPS) in the Gulf of Mexico.