Integrated marine foundations solution delivered for offshore mooring pile installation in Congo
Project overview
Developer partners
Micoperi
Project
Scarabeo 5 mooring pile installation
Location
Offshore Congo
Depth
38 m water depth
Solution
Integrated drilling, grouting and engineering solution
Menck, Acteon’s Marine Foundations business line, alongside 2H, Acteon’s Engineering Consultancy, delivered an integrated drilling and grouting solution for eight offshore mooring piles in 38 m water depth. The work formed a critical part of the foundation installation for the Scarabeo 5 project offshore Congo.
Navigating a critical phase
The project required precise drill-casing operations in a remote offshore location, with complex access constraints and strict pre-operational stability requirements to ensure safe execution.
The result
The Scarabeo 5 mooring pile installation was completed safely, with all eight sockets drilled and grouted to full depth and diameter and executed to specification. Continuous data monitoring and on-site laboratory testing ensured consistent quality throughout the campaign.
The integrated approach across our engineering and offshore execution teams enabled efficient delivery in a challenging environment, achieving high-quality foundations and full client acceptance while maintaining safe offshore performance.
Related case studies
Explore more Integrated marine foundation installation solutions projects
Case Studies
Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm
Case Studies
Integrated offshore jacket installation and foundation solution in the Republic of Congo
Case Studies
Seamless integration: Acteon's North Sea grouting operation success
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.