Integrated offshore jacket installation and foundation solution in the Republic of Congo
Project overview
Location
Republic of Congo
Developer partners
Hilong Marine Engineering (HK) Ltd.
Water depth
27 m
Solution
Fully integrated jacket installation solution
Menck, Acteon’s Marine Foundations business line, delivered a fully integrated jacket installation solution for the Congo LNG project in 27 m water depth.
Precision under pressure
The project required precise execution in a challenging marine environment. Tight tolerances, complex logistics, and remote coordination added pressure to deliver a safe, first-time-right installation.
The result
We completed the installation of the jacket, enabling Hilong Marine Engineering to meet offshore deadlines on a strategically important project. The integrated solution reduced vessel time, minimised risk, and avoided delays, supporting cost control and environmental goals. This project demonstrated our ability to deliver creative, fit-for-purpose solutions through coordinated offshore execution and strong global logistics.
Related case studies
Explore more drilled pile installation services projects
Case Studies
Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm
Case Studies
Efficient and safe lifting for gas field development offshore Australia
Case Studies
Monopile collar installation at Kaskasi Offshore wind farm
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.