Installation of 72 monopiles on Kriegers Flak offshore wind farm
Project overview
Project name
Kriegers Flak
Location
Baltic Sea
Developer partner
Van Oord
Solution
6 m diameter monopile installation
Menck, Acteon’s Marine Foundations business line, delivered a customised hydraulic hammer spread to support the installation of 72 6-m coated monopiles on Denmark’s largest offshore wind farm, Kriegers Flak.
Maintaining speed and efficiency
To maintain the desired installation rate of one monopile every 24 hours, Van Oord required proven offshore foundation capabilities and equipment that could operate without interruption.
Minimising downtime and maintaining performance
We supplied our MHU 3500S hydraulic hammer, modified with a bespoke pile sleeve to drive the 6-m diameter coated monopiles, alongside complete support services. The system was powered by three MHP 1600 power packs and supported by a 2.5-inch hose spread. The scope of services included project management, engineering, equipment modification and preparation, logistics, commissioning, and the offshore operation of the hammer spread by expert technicians.
To maintain the required monopile installation rate and deliver added value, we focused on ensuring the continuous operational readiness of the hammer spread. Onsite personnel carried out pre- and post- installation equipment inspections with precision and accuracy, supported by onshore subject matter expertise and spare part management. This coordinated approach helped minimise downtime and sustain performance throughout the project.
Innovations in action
- Custom-engineered MHU 3500S hydraulic hammer with advanced monitoring supported faster installation
- Near real-time data tracking enabled early issue detection and reduced downtime
- Bespoke equipment mods and proactive logistics maintained high operational efficiency
The result
Our tailored hammer spread and efficient offshore execution enabled Van Oord to install 72 monopiles in record time with zero unplanned downtime. This streamlined delivery reduced cost and complexity for the client while meeting their expectations with the project delivery from start to finish.
Through our extensive experience, advanced equipment and intelligent approach, we developed an innovative, customised solution that maximised Van Oord’s project uptime.
Related case studies
Explore more integrated marine foundation installation services projects
Case Studies
Integrated marine foundations solution delivered for offshore mooring pile installation in Congo
Case Studies
Largest offshore grout pour to date delivered at Yeu-Noirmoutier Wind Farm
Case Studies
Integrated offshore jacket installation and foundation solution in the Republic of Congo
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.