Fast and reliable mooring line repair on an FPSO
Project overview
Project name
Fast and reliable mooring line repair on an FPSO
Location
Brazil
Solution
Mooring lines reconnection
Intermoor, Acteon’s Moorings and Anchors business line, carried out a successful emergency mooring intervention on a 10-year-old Floating Production Storage and Offloading (FPSO) offshore Brazil.
Fast and reliable repair of the mooring lines
Out of the 16-line mooring spread, three parted mooring lines required reconnection. A parted mooring line, also known as a snap-back, is a marine incident that occurs when a mooring line breaks or fails under tension.
Scope of work
The operations began with equipment mobilisation at InterMoor’s shore base at Açu port, involving a collaborative effort from Intermoor and other logistics partners. The mobilisation benefited from Intermoor’s Açu base’s 24/7 marine access and 295 ft (90 m) of available quayside. The repair was quickly and safely completed.
Following the completion of operations on the first set of mooring lines, the customer requested a subsequent campaign to replace the entire length of the chain. During this second campaign, the crew replaced the polyester rope and the first section of the bottom chain. This task required constant and precise communication between the FPSO and the Anchor Handling Tug Supply (AHTS) to control the length of the pull-in wire and ensure the polyester rope did not lay on the seabed, despite the shallow 20-metre depth. Despite the complexity, the operation was completed without incidents or delays.
To conclude the scope of work, the crew also replaced the first section of the bottom chain from one of the mooring lines with a new chain. Despite the significant challenge of managing a heavy section of chain hanging from the vessel’s stern roller, the operation was successfully completed.
Innovations in action
Intermoor’s engineers custom designed an IM® H-Link to join both ends of the mooring chain. They provided a complete package including design, fabrication and installation that ensured a single interface for faster execution.
The result
The team successfully overcame several technical challenges and safely achieved the customer’s objective to ensure fast and reliable repair of the mooring lines. Professional delivery guaranteed safe station-keeping, returned the FPSO to its original operational condition, and minimised the impact on production.
The FPSO captain further confirmed that all three mooring lines were tensioned to meet project specifications.
Related case studies
Discover the latest mooring integrity management case studies from Acteon
Case Studies
Innovative chain replacement method supports Bonga’s life extension project
Case Studies
Complex FPSO top chain replacement completed safely and efficiently
Case Studies
Uninterrupted production during mooring line top wire replacement
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.