From mooring to decommissioning with a deepwater FPU

Published 11 Jul 2019 Updated 19 Feb 2026

The FPU Innovator in the Gulf of Mexico which Intermoor completed decommissioning work on.

Project overview

Project name

Innovator FPU

Location

Gulf of Mexico

Solution

Lifecycle asset management

Intermoor, Acteon’s Moorings and Anchors business line, executed a multi-phase life-extension and decommissioning campaign for the Innovator floating production unit (FPU) in the Gulf of Mexico, spanning relocation, assessment, and safe disconnection.

Managing an asset in transition

Across the eight-year partnership, we managed: 

  • Mooring installation and hook-up: limited platform space and complex onboard chain management
  • Maintenance and upgrades: mooring line inspection and upgrade of five of the mooring legs due to new Metocean regulations
  • Decommissioning: precise riser handling and disconnection of mooring lines during close-proximity decommissioning operations  

Lifecycle support across multiple phases

From relocation in 2006 to decommissioning in 2014, we provided tailored engineering and operational services. 

We designed and installed a 12-leg mooring system comprising suction embedded plate anchors (SEPLAs), stud link chain, subsea connectors and polyester mooring ropes. To address limited platform space, we developed a custom solution: routing excess inboard chain through hawsepipes and suspending it below the platform in the water. This configuration required meticulous management using deadman slings and straps to prevent overloading the chain jacks, with divers assisting in operations. 

In 2011, to comply with updated Metocean regulations and possibly extend the platform's life, we conducted mooring line inspections, replaced all rig wires and upgraded five mooring legs. Detailed analytical modelling and design processes ensured the upgraded system met new criteria. Strategic equipment placement and clear communication were vital during rig wire replacements, especially given the confined workspace and limited crane access. 

Three years later, we managed the decommissioning process:  disconnecting all 12 mooring lines and 10 risers/umbilicals, securing them to the seabed with concrete mattresses. Detailed modelling predicted riser behaviour, enabling precise and reliable laydown within 50 ft of projections. Coordinated efforts ensured the safe towing of the Innovator hull to Ingleside, Texas. 

Innovations in action

  • SEPLAs for secure deepwater mooring
  • Custom hawse pipe system for managing excess inboard chain
  • Deadman slings and straps to control chain weight distribution
  • Detailed analytical modelling for mooring system upgrades and decommissioning planning
  • Strategic rigging and simultaneous operations coordination  

The result

Our integrated approach ensured the FPU Innovator's mooring system operated safely and efficiently throughout its life. Innovative solutions addressed unique challenges, from initial installation through upgrades to decommissioning.  

We delivered a safe, compliant and effective transition from production to decommissioning highlighting our ability to deliver across the offshore asset lifecycle. 

Related case studies

Explore more decommissioning engineering projects

Case Studies

21 Jul 2026

Development and installation of towing systems on an FPSO in deep water

Intermoor, Acteon’s Moorings and Anchors business line, delivered the safe design, installation and commissioning of an emergency towing system and the towing system for FPSO Cidade de Niterói MV18 in 1,400 m water depth.

Case Studies

17 Jun 2026

Deepwater decommissioning campaign for Petrojarl I FPSO

Intermoor, Acteon’s Moorings and Anchors business line, executed a multi-phase offshore decommissioning campaign for Petrojarl I FPSO offshore Brazil. The first phase included the provision of engineering for pull-in wire replacement, risers pull-out, mooring line disconnection, including a contingency plan of non-operability of mooring winches and the FPSO towing preparation and tow plan.

Case Studies

12 Sep 2025

Floating Storage and Offloading (FSO) disconnection, removal and towing

Intermoor, Acteon’s Moorings and Anchors business line, completed the disconnection, removal, and towing of a 20-year old FSO vessel in the Gulf of Thailand.