Successful custom CALM buoy disconnection offshore West Africa

Published 03 Jul 2019 Updated 18 Sep 2025

Intermoor completing a decommissioning project for Red Hawk Spar involving disconnecting risers from a CALM buoy.

Project overview

Location

West Africa

Water depth

384 m

Solution

CALM Buoy riser disconnection

Intermoor, Acteon’s Moorings and Anchors business line, disconnected, plugged and laid down two risers from a catenary anchor leg mooring (CALM) buoy, using bespoke tooling and engineering solutions.  

Rethinking riser disconnection for ageing infrastructure

The client needed alternative methods to recover ageing risers in 384 m of water in case reversing the original pull-in approach was not possible. 

Tailored engineering for safe, strategic removal

With the original recovery methods posing integrity and safety risks, we developed a customised, lower-impact solution to disconnect and lay down the risers, addressing ageing asset constraints, schedule sensitivity and the need for cost-effective offshore execution. 

Working in partnership with 2H, our Engineering experts, we designed, fabricated and deployed custom subsea riser clamps to support the operation. This solution, together with towing socks, provided an alternative removal procedure, enabling precise control as risers were guided to the deck for plug installation before being laid down on the seabed. 

This integrated approach not only addressed the technical and environmental complexities but also ensured local language capability and regional delivery from our West Africa base, with support from our fabrication facility in Louisiana, USA. 

The result

We successfully completed the project on schedule, under budget and with zero incidents. Through flexible design, innovative tooling and local delivery, the team enabled a safer and more comprehensive life-of-field solution.  

Related case studies

Discover more decommissioning engineering projects

Case Studies

21 Jul 2026

Development and installation of towing systems on an FPSO in deep water

Intermoor, Acteon’s Moorings and Anchors business line, delivered the safe design, installation and commissioning of an emergency towing system and the towing system for FPSO Cidade de Niterói MV18 in 1,400 m water depth.

Case Studies

17 Jun 2026

Deepwater decommissioning campaign for Petrojarl I FPSO

Intermoor, Acteon’s Moorings and Anchors business line, executed a multi-phase offshore decommissioning campaign for Petrojarl I FPSO offshore Brazil. The first phase included the provision of engineering for pull-in wire replacement, risers pull-out, mooring line disconnection, including a contingency plan of non-operability of mooring winches and the FPSO towing preparation and tow plan.

Case Studies

12 Sep 2025

Floating Storage and Offloading (FSO) disconnection, removal and towing

Intermoor, Acteon’s Moorings and Anchors business line, completed the disconnection, removal, and towing of a 20-year old FSO vessel in the Gulf of Thailand.

Speak to our team

Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.