Successful custom CALM buoy disconnection offshore West Africa

03 Jul 2019

Intermoor completing a decommissioning project for Red Hawk Spar involving disconnecting risers from a CALM buoy.

Project overview

Location

West Africa

Water depth

384 m

Solution

CALM Buoy riser disconnection

Intermoor, Acteon’s Moorings and Anchors business line, disconnected, plugged and laid down two risers from a catenary anchor leg mooring (CALM) buoy, using bespoke tooling and engineering solutions.  

Rethinking riser disconnection for ageing infrastructure

The client needed alternative methods to recover ageing risers in 384 m of water in case reversing the original pull-in approach was not possible. 

Tailored engineering for safe, strategic removal

With the original recovery methods posing integrity and safety risks, we developed a customised, lower-impact solution to disconnect and lay down the risers, addressing ageing asset constraints, schedule sensitivity and the need for cost-effective offshore execution. 

Working in partnership with 2H, our Engineering experts, we designed, fabricated and deployed custom subsea riser clamps to support the operation. This solution, together with towing socks, provided an alternative removal procedure, enabling precise control as risers were guided to the deck for plug installation before being laid down on the seabed. 

This integrated approach not only addressed the technical and environmental complexities but also ensured local language capability and regional delivery from our West Africa base, with support from our fabrication facility in Louisiana, USA. 

The result

We successfully completed the project on schedule, under budget and with zero incidents. Through flexible design, innovative tooling and local delivery, the team enabled a safer and more comprehensive life-of-field solution.  

Related case studies

Discover more decommissioning engineering projects

Case Studies

12 Sep 2025

Floating Storage and Offloading (FSO) disconnection, removal and towing

Intermoor, Acteon’s Moorings and Anchors business line, completed the disconnection, removal, and towing of a 20-year old FSO vessel in the Gulf of Thailand.

Case Studies

17 Jul 2025

Seamless pipeline tie-in decommissioning and asset transfer

Intermoor delivered 46 complex pipeline tie-in disconnections, asset recoveries, and wet storage operations across multiple offshore fields for a major Southeast Asia energy operator.

Case Studies

11 Jul 2019

From mooring to decommissioning with a deepwater FPU

Intermoor provided end-to-end mooring services for an FPU in the Gulf of Mexico, from installation to safe decommissioning over an eight-year period.