Efficient and safe lifting for gas field development offshore Australia
Project overview
Location
Western Australia
Industry
Offshore gas field development
Solution
Rocksteady® RSL 500 lift tools
Menck, Acteon’s Marine Foundations business line, supplied two Rocksteady® RSL 500 lift tools and receptacles to safely install pile-top drilling rigs on a gas field offshore Western Australia.
Navigating a critical phase
The customer needed to lift heavy pile-top rigs from mast crowns high above deck level, requiring precise, safe, and efficient offshore rigging solutions.
Reliable offshore lifting solution
We delivered two Rocksteady® RSL 500 hydraulically operated lift tools and matching receptacles, engineered to meet the specific requirements of HMH Wirth’s drilling rigs. Each system featured radio remote-control lock verification, enabling operators to connect and disconnect safely from a distance, eliminating the need for manual sling handling at height.
The Rocksteady® system’s fail-safe mechanical locking mechanism remains engaged even under full load during a power loss, with a manual override available for controlled disconnection. Pre-installed receptacles reduced sling lengths, removed hook height restrictions, and streamlined rigging operations. The design’s wide funnels and capture angles accommodated offshore motion, ensuring smooth engagement even from floating vessels.
With a decade-long track record across global offshore projects, Rocksteady® has proven itself as a reliable quick-connect lifting solution. By deploying this system, we enabled the customer to complete lifts safely, efficiently, and with reduced risk while also cutting project costs and avoiding delays.
Innovations in action
- Rocksteady® RSL 500 hydraulically operated lift tools with radio remote-control lock verification
- Fail-safe locking mechanism with manual override capability
- Pre-installed receptacles to minimise sling use and hook height challenges
- Offshore-ready design with wide funnels and capture angles for dynamic environments
The result
The Rocksteady® system delivered secure, hands-free lifting of pile-top rigs from challenging mast crown positions, reducing manual rigging and boosting safety. Pre-installed receptacles and fail-safe locking cut rigging hours and improved efficiency, saving costs and avoiding downtime. The system’s reliability and adaptability ensured continuity of lifting operations, giving the customer confidence in safe, timely delivery of their offshore gas field development.
Related case studies
Discover more integrated marine foundation installation projects
Case Studies
Seamless integration: Acteon's North Sea grouting operation success
Case Studies
Dual FPSO installation of driven and suction pile mooring systems offshore China
Case Studies
Monopile collar installation at Kaskasi Offshore wind farm
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.