Efficient and safe lifting for gas field development offshore Australia

20 Mar 2025 1 minute 30 seconds

The Rocksteady® lift tool - a quick connector designed for heavy offshore lifting operations.

Project overview

Location

Western Australia

Industry

Offshore gas field development

Solution

Rocksteady® RSL 500 lift tools

Menck, Acteon’s Marine Foundations business line, supplied two Rocksteady® RSL 500 lift tools and receptacles to safely install pile-top drilling rigs on a gas field offshore Western Australia. 

Navigating a critical phase  

The customer needed to lift heavy pile-top rigs from mast crowns high above deck level, requiring precise, safe, and efficient offshore rigging solutions.

Reliable offshore lifting solution 

We delivered two Rocksteady® RSL 500 hydraulically operated lift tools and matching receptacles, engineered to meet the specific requirements of HMH Wirth’s drilling rigs. Each system featured radio remote-control lock verification, enabling operators to connect and disconnect safely from a distance, eliminating the need for manual sling handling at height. 

The Rocksteady® system’s fail-safe mechanical locking mechanism remains engaged even under full load during a power loss, with a manual override available for controlled disconnection. Pre-installed receptacles reduced sling lengths, removed hook height restrictions, and streamlined rigging operations. The design’s wide funnels and capture angles accommodated offshore motion, ensuring smooth engagement even from floating vessels. 

With a decade-long track record across global offshore projects, Rocksteady® has proven itself as a reliable quick-connect lifting solution. By deploying this system, we enabled the customer to complete lifts safely, efficiently, and with reduced risk while also cutting project costs and avoiding delays. 

Innovations in action

  • Rocksteady® RSL 500 hydraulically operated lift tools with radio remote-control lock verification
  • Fail-safe locking mechanism with manual override capability
  • Pre-installed receptacles to minimise sling use and hook height challenges
  • Offshore-ready design with wide funnels and capture angles for dynamic environments 

The result 

The Rocksteady® system delivered secure, hands-free lifting of pile-top rigs from challenging mast crown positions, reducing manual rigging and boosting safety. Pre-installed receptacles and fail-safe locking cut rigging hours and improved efficiency, saving costs and avoiding downtime. The system’s reliability and adaptability ensured continuity of lifting operations, giving the customer confidence in safe, timely delivery of their offshore gas field development. 

Related case studies

Discover more integrated marine foundation installation projects 

Case Studies

Seamless integration: Acteon's North Sea grouting operation success

Menck, Acteon’s Marine Foundations business line delivered offshore grouting services to install a wellhead platform foundation and four-legged jacket with driven foundation piles in the North Sea.

Case Studies

Dual FPSO installation of driven and suction pile mooring systems offshore China

Intermoor delivered a complex mooring campaign for two FPSOs offshore China, installing 25 mooring lines and suction piles under tight weather windows and Covid-19 restrictions.

Case Studies

Monopile collar installation at Kaskasi Offshore wind farm

Menck delivered precision grouting and custom equipment for the first-ever monopile collar stabilisation trial at Germany’s Kaskasi wind farm.

Speak to our team

Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.