Efficient mooring chain inspection and replacement for FPSO in UK North Sea
Project overview
Project name
Global Producer III FPSO mooring chain inspection
Location
Dumbarton field, UKCS Block 15
Developer partners
NEO Energy
Water depth
145 m
Solution
Mooring integrity inspection and replacement
Intermoor, Acteon’s Mooring and Anchors business line, completed a mooring chain inspection and replacement campaign for the Global Producer III (GP3) floating production, storage, and offloading (FPSO) vessel on behalf of NEO Energy in the UK North Sea.
Targeted inspection under challenging conditions
Significant marine growth, a tight timeline and proximity to live production required precise planning and safe execution during the ten-line mooring system inspection.
Delivering assurance through integrated mooring services
Acteon provided end-to-end services, including engineering, project management, vessel sourcing, offshore personnel, and equipment. The team conducted as-found surveys, recovered three mooring lines for ultra-high-pressure cleaning and inspection, replaced necessary chain sections, and reinstated the system to its original position. The remaining lines were inspected subsea.
Despite challenges such as heavy marine growth and limited payout from the FPSO, detailed offshore planning enabled safe, efficient operations. We replaced chains with minimal use of additional connectors to preserve system integrity. All activities were completed in line with DNV standards and without impacting FPSO production, allowing NEO Energy to confidently plan its projects and optimise production through operational uptime.
Innovations in action
Ultra-high-pressure cleaning systems enabled effective marine growth removal for inspection. Strategic planning and prior project experience allowed us to optimise vessel selection and minimise downtime.
The result
The project was delivered on time, with no safety incidents or impact on FPSO production. Our inspection, repair and maintenance (IRM) expertise and familiarity with the GP3 system enabled a successful mooring inspection and life extension campaign. Our approach enables data-driven decision making, allowing NEO Energy to act with confidence and precision.
Related case studies
Explore more mooring integrity management projects
Case Studies
Innovative chain replacement method supports Bonga’s life extension project
Case Studies
Fast and reliable mooring line repair on an FPSO
Case Studies
Complex FPSO top chain replacement completed safely and efficiently
Speak to our team
Our team of experts will design a solution that fits the technical, environmental and commercial demands of offshore projects.