Suction Pile Buckling

Introduction

Suction piles (aka suction caissons) have been used as anchors and foundations for decades, especially in deep water. For the suction pile to perform properly, the skirt wall must be thick enough, to maintain its shape during installation to resist buckling. In this article, we will review:  

  • What is buckling
  • How to prevent it

What is buckling?

When installing a suction pile, underpressure must be applied by an ROV’s pump to advance the pile from its self-weight penetration to its target embedment depth. Based on soil properties, engineers develop a required suction pressure curve to guide the pile design. 

Imagine drinking a very thick milkshake: when you draw too hard on the straw, it collapses on itself and you are denied ice creamy goodness. The straw’s skirt wall just buckled! The thickness was not adequate to maintain circularity during underpressure. At a malt shop, this is a simple matter of getting a new straw and drinking more carefully. Offshore, it means a ruined, expensive, heavy suction pile that needs to be extracted and replaced. 

How do engineers prevent buckling?

It would be easy to design a suction pile with a very thick wall that would never buckle, but it would be unnecessarily expensive, heavy, and cumbersome to handle.

Structural engineering 

A little math (well, a lot, but the computer does it) goes a long way to make a suction pile design an ideal foundation solution. Non-linear finite element analysis is applied to a mathematical model of the suction pile. The model is distorted to a 1% out-of-roundness to reflect industrial fabrication tolerances and allow buckling to initiate. Linear springs are applied radially to the pile elements to replicate soil stiffness acting on the pile.

Buckling mode 

Once the primary buckling mode is established in an initial run, the model is perturbed to 10% of that deformed shape. Now the pressure is ramped up and the maximum displacement is recorded. When the rate of displacement accelerates, it represents the inelastic deformation of the pile. Sometimes, a predetermined deflection limit will be used to indicate this, if optimisation is not required. The pressure is recorded at this instance at the particular depth. This process is performed at different depths between self-weight penetration and the target embedment, until a structural allowable pressure curve is developed. This curve is reduced by a factor of 1.5 for safety. Combined with the geotechnical allowable pressure curve, the installation crew can confidently apply the prescribed underpressure to successfully embed the pile. 

Suction piles carry an inherent risk of buckling, but with rigorous geotechnical and structural engineering, the risk can be properly mitigated.

SEPLA

Lowering mooring costs and emissions with suction-embedded plate anchors. Discover our suction embedded plate anchor technology, four times lighter than suction piles and as efficient.

Related articles

Find out more about suction piles and anchoring solutions here

Blogs

17 Mar 2026

Anchored in experience: How permanent moorings are evolving for FPSOs

The offshore energy market is entering a new era of demand and complexity. Floating production storage and offloading (FPSO) activity is surging across South America, Africa and Asia, with schedules tightening and vessel availability remaining a critical constraint. According to Rystad Energy, over $70 billion in FPSO capex is forecast over the next decade – around 85% of it concentrated in these three regions. As investment ramps up and timelines compress, every day offshore counts.

Blogs

19 Feb 2026

Engineering offshore resilience: Designing for adaptability and efficiency

The offshore energy sector is evolving rapidly. Both oil and gas fields and offshore wind farms are under pressure to deliver reliable energy while keeping projects affordable. The design choices engineers make today will determine whether these projects remain adaptable, resilient and ready to meet future challenges or whether they become locked into costly, rigid solutions that limit flexibility for decades.

Blogs

27 Jan 2026

Inside a mooring FEED Study: How to de-risk FPSO projects 

When planning a Floating Production Storage and Offloading (FPSO) project, the Front-End Engineering Design (FEED) study is where strategy meets precision. For mooring engineers and project managers, this phase sets the foundation for safe, efficient, and cost-effective mooring solutions. 

Acteon has designed and fabricated hundreds of suction piles

Access our latest track record