Skip to content

Replacing spent platform anodes with subsea anode strings in the Gulf of Mexico

  • 24
    Anode strings
  • 12
    Subsea clamps
  • 220
    Ft seawater

Related Integrated Services

Flexible Riser Integrity Monitoring Wirebreak fatigue from Pulse
Case study pack download

Subsea Asset Integrity Management Case Study Pack

Solutions for operations and late-life project phases

Discover four examples of our subsea asset integrity assurance solutions which provide independent, engineered-for-purpose and data-driven solutions for critical supporting subsea infrastructure. Download this e-book for Acteon solutions that serve operations and late-life project phases.

Download

Related Information