Successful FPSO mooring installation under tight schedule
Foundations and cables Moorings and anchors

Successful FPSO mooring installation under tight schedule

Several Acteon branded services came together to deliver a seamless integrated FPSO mooring installation, making use of robust internal systems, competency frameworks...
Installation of two deepwater FPSO mooring systems in a single integrated campaign
Foundations and cables Moorings and anchors

Installation of two deepwater FPSO mooring systems in a single integrated campaign

InterMoor, an Acteon company, was contracted for the provision of engineering and offshore services for the installation of 16 mooring lines to a semisubmersible...
Installation of 72 monopiles on Kriegers Flak windfarm in record time
Foundations and cables

Installation of 72 monopiles on Kriegers Flak windfarm in record time

The monopile foundation installation is one of the key elements of an offshore wind farm construction project, and MENCK, an Acteon company was contracted to provide...
DEME saves critical vessel time with grouting solution
Foundations and cables

DEME saves critical vessel time with grouting solution

With a 487 MW capacity, SeaMade is the largest offshore wind farm in Belgium and will feature 58 Siemens Gamesa Renewable Energy (SGRE) SG 8.0-167 DD wind turbines. DEME...
Offshore installation of a 7” threaded tubing pipeline in the Mediterranean Sea
Foundations and cables

Offshore installation of a 7” threaded tubing pipeline in the Mediterranean Sea

Petrobel (a joint venture company between ENI & the Egyptian General Petroleum Company), required Aquatic to complete the offshore installation of a 7” threaded tubing...
Deepwater foundation conductor installation for Papa Terra field, Brazil
Foundations and cables

Deepwater foundation conductor installation for Papa Terra field, Brazil

InterMoor installed drilling and production conductors using own patented conductor installation methodology on the papa terra field in the Southern Campos basin, Brazil.
SURF installation project completed ahead of schedule during monsoon season
Foundations and cables Geo-services

SURF installation project completed ahead of schedule during monsoon season

InterMoor demonstrated their subsea, umbilicals, risers and flowlines (SURF) capabilities and delivered the installation of a new electric submersible pump (ESP) system...
A world-first for floating drill operations using motion compensation in deep water
Foundations and cables Geo-services Moorings and anchors

A world-first for floating drill operations using motion compensation in deep water

Imodco Terminals were contracted to install a catenary anchor leg mooring (CALM) buoy to facilitate the reliable transfer of products from very large crude carriers to...
Grouting of Monopiles Transition Pieces: 116 Piles, United Kingdom
Foundations and cables

Grouting of Monopiles Transition Pieces: 116 Piles, United Kingdom

The grout was installed in order to provide impact and corrosion protection to the foundations. Core used a high-capacity continuous jet mixing unit to ensure...