Latest news

12.10.15 Pulse awarded NOV contract for acoustic mooring line monitoring system in Norway

Pulse Structural Monitoring (Pulse), an Acteon company, has been awarded a contract with National Oilwell Varco (NOV) Arendal in Norway to provide an acoustic mooring line subsea monitoring system to measure mooring line inclination and tension.

22.09.15 Unlocking New Opportunities Through The Cycle

Paul Alcock, Executive Vice President, Acteon, spoke to S2S about challenges and opportunities for the subsea services sector in the current economic climate

22.09.15 Subsea Treasure Hunting

A predator remotely operated vehicle looks for gold

22.09.15 Robust Kit and Quick Response Score Points

LDD exceeds expectations and proves why it was nominated as an operators specialist foundation installation supplier of choice, offshore Africa.

22.09.15 Pushing The Technology Envelope - A Benchmark Tripod Platform Design From 2H Offshore

A project that started out as a feasibility study for a freestanding exploration well is now a fully installed structure with the deepest well drilled to date in Dubai and a benchmark project for 2H Offshore.

22.09.15 Interact Heads Major Infrastructure Replacement Construction And Engineering Management Specialist Sees Growing Call Upgrades of Aging Infrastructure On The West Coast Of America

The need for higher capacity cranes that also meet strict new emission standards is leading to a rise in refurbishment and replacement projects on the west coast of the USA. As a result, construction and engineering management expertise at InterAct is in high demand.

22.09.15 UTEC Geomarine Successfully Completes Caspian Sea Project Using geoROV™ Technology

UTEC Geomarine, the geotechnical service line of UTEC Survey, an Acteon company, has successfully completed the first phase of a geotechnical site investigation in the Caspian Sea for a major oil and gas operator.

22.09.15 Floating production in China

Intermoor impresses with its Aisia Pacific resourcefulness

22.09.15 Creative Procedures

Permanent mooring systems for floating production units are becoming ever more substantial, and using traditional anchor-handling vessels to install them is proving increasingly challenging.

22.09.15 Bridging The Gap

Exploration and production operators are continually having to comply with more and ever changing regulations; to keep up with changing technology; and to adjust to the unstable economic climate of today’s oil and gas industry.